- This project will replace the existing aging water pump facility at the Grainger Springs spring wells site. The project will build a new pump building and new pumps.
- This project was awarded to McClure and Sons Inc. on February 13, 2024.
- Construction to begin late July 2024.
- The project is currently in the design phase for the construction of a roundabout.
- The design consultant is SCJ Alliance.
- This project will install approximately 650LF of curb, gutter, and sidewalk along Kelly Lake Road E, within the City Right of Way. Additionally, provide storm water collection system and modifications and utility modifications to construction proposed sidewalks.
- This project was awarded to Strickland and Sons Excavation.
- Construction to begin late April 2025.
- This project includes planning and overlay of approximately 35,300 square feet of asphalt roadway and partially full depth road restoration for four different locations at 76th St E, 77th St E, 180th Ave Ct E, and 191st Ave Ct E.
- This project was awarded to Strickland and Sons Excavation.
- Construction to begin late April 2025.
- This project includes rehabilitation and lining of concrete manholes and chemically sealing infiltration points.
- This project was awarded to sun Coast Environmental NW Inc.
- Work to begin late Spring 2025.
- This Project includes cleaning catch basins and other drainage structure gates and vactor cleaning drainage structures. The work also consists of performing inspections inside existing stormwater pipe and replacing cement concrete curb and gutter.
- This work was awarded to Diversified Holdings NW
- Work to begin Spring 2025.
- This project consists of the installation of a pre-purchased generator and automatic transfer switch at the Public Safety Building.
- This project was awarded to MB Electric.
- Start date is still to be determined as parts are on order with a long lead time.
Developer Managed Projects
- This project is a commercial building currently under construction.
- This a commercial development project currently under construction.
- This project will provide multiple commercial structures located at 22911 Hwy 410 E.
- WSDOT Developer Agreement
Office Hours:
Monday - Thursday
9:00 - 4:00
Fridays
By Appointment Only
Contact:
Engineering
Location:
Public Services Center
21719 96th ST E
Buckley, WA 98321
Mailing:
City of Bonney Lake
Attn: Engineering
21719 96th ST E
Buckley, WA 98321
Phone: 253-447-4356
Fax: 253-862-1116